Location: JW Marriott Los Angeles
900 W Olympic Blvd, Los Angeles, CA 90015
For Analyst and Media, contact [email protected]
Breaking Copper and Optical Barriers
10X Copper
3X Lower
1000X Lower
3X Lower
Purpose-built for 400G and 800G AECs
2X Lower
15X Lower
40% Lower
Beyond Copper and Optics,
How e-Tube Powers the Terabit Era
AI Data Centers Demand More
Than Copper Can Deliver
Start-up plans to use terahertz radio frequencies for communication between servers instead of copper or optical connections — radio-based interconnections offer 1.6 TB/s using half the volume of copper
Futuring Interconnect Infrastructure for AI:
RF Transmission over Plastic Cable Surpasses Copper and Optics at Terabit Scale
Beyond Copper and Optical, a New
Interconnect Eyes Next Gen Data Centers
Point2 e-Tube and Retimer Technology: Enabling 1.6 Tbps and Beyond
LATEST NEWS
Technology with The Earth In Mind
Interconnect To Reduce TCO
Training an AI Large Language Model (LLM) can take up to six months and costs $10M USD. A recent study showed this cost is split between compute (70%) and interconnect (30%). With latency that is 1000X lower, Point2’s e-Tube Technology Platform can dramatically reduce interconnect time and cost spent on LLM training.
Take the first step towards building the industry’s most energy-efficient interconnects today..
Talk to experts about how to maximize the potential of ultra-low power interconnect SoCs from Point2
"*" indicates required fields
